Timeline have designed and implemented:
-
Windows Server 2000-2008R2 including Exchange 2010
-
Microsoft SQL 2000-SQL2008R2 including overview of Oracle
-
Microsoft Active Directory /Group Policy/DNS/DHCP
-
VmWare 4.1( 2 Physical servers+ Vcontrol Centre)
-
Netapps Storage San ( 4 controllers+ 2 Filers)
-
Linux (CentOS, Fedora) Webservers, Firewall, External DNS, MySQL
-
Cisco network consisting of VSS pair 6509’s convergent distributed 2600 stacks on Edge
-
Cisco Door Access/HID iClass system, largest installation in the world at present.
-
Cisco Call Manager/Unity 8.5 (Exchange 2010 integrated) Cisco TelePresence
- Cisco IPS+Firewalls including Cisco IronPort/SSL VPN, WebEx
The IT projects were delivered in budget and on-time. The IT infrastructure was designed as a VOIP network using Cisco systems that included: HID door access control, RFID, IP CCTV, IP Cisco telephony, Cisco telepresence, Cisco Digital Media Signage (DMS), Condeco electronic room signage and a state-of-the-art server farm and SAN.
Timeline developed the requirements and tenders for the above technologies and secured finance through Cisco capital finance at very favourable rates.
